Steeldraft SRL
0.4 FTEThe score of Steeldraft shows with a free account.
See the score- Summary? / 5
- Balance sheet strength
- Liquidity
- Repayment capacity
- Profitability
- Trajectory
- Compliance and register
- Position in its sectorvs peers
- Supplier creditat 30 d
- Borrowing capacityborrowable
- Valuationcentral
Visible once signed in: create your account, the 14-day Pro trial is free.
Key figures 2025
Change 2023 → 2025: Equity +5232 % Total assets +60 %
Accounts of the company itself (not consolidated).
The full file covers 3 financial years; a free account shows 2. →Deterministic calculation on the filed accounts, no AI. Dispute the score or report an error
Steeldraft's annual accounts
Filed annual accounts
- Year ended 30 Jun 2025filed on 03 Jan 2026
- Year ended 30 Jun 2024filed on 31 Dec 2024
- Year ended 30 Jun 2023filed on 13 Jan 2024
Steeldraft's financial analysis
- Solvency93.0%sector median: 57.7%
- Current ratio
- Net margin
- ROE
- Financial debt / EBITDA
- Interest coverage
- Days sales outstanding (DSO)
Management and control of Steeldraft
Steeldraft's publications in the Belgian Gazette
Company number, VAT number and registered office
- Company number (CBE)
- 0790.280.576
- VAT number
- BE0790280576
- Peppol
- Registered · 0208:0790280576 · as of 10 Nov 2026
- Legal form
- SRL
- Incorporated
- 31 Aug 2022
- Registered office
- 9930 Lievegem
- Size
- Micro · 0.4 FTE
- Latest accounts
- 2025 · filed on 03 Jan 2026
- Activity
- Engineering activities and technical consultancy, except activities of land surveyors (NACE 71121)
Steeldraft (SRL) has been based in Lievegem since 2022, active in: engineering activities and technical consultancy, except activities of land surveyors. For 2025, it reports a net profit of 100,317 € and equity of 159,962 €; its revenue is not published. With 0.4 full-time equivalents, it is a micro-enterprise by headcount. Its solvency stands at 93.0%, above the median of its sector (57.7%).
Companies similar to Steeldraft
Companies in the same business, of comparable size and area, outside its group.
- Listycon Engineering activities and related technical consultancy Evergem · balance sheet 120,875 €
- Jolecon Engineering activities and related technical consultancy Deerlijk · balance sheet 155,192 €
- Amtrad Environmental Engineering activities and related technical consultancy Waregem · balance sheet 17,095 €
- Vertavie Engineering activities and related technical consultancy Bruges · balance sheet 178,924 €
- De Mey Consulting Engineering activities and related technical consultancy Lochristi · balance sheet 165,322 €
- D-PNT Engineering activities and related technical consultancy Wichelen · balance sheet 136,647 €
- Rebel in Light Engineering activities and related technical consultancy Hasselt · balance sheet 194,851 €
- Johnson Partners Consultancy Engineering activities and related technical consultancy Fleurus · balance sheet 123,449 €
Frequently asked questions about Steeldraft
What is the revenue of Steeldraft?
Steeldraft files its accounts in a format where revenue is optional: it is not published for 2025.
What is the VAT number of Steeldraft?
In Belgium, the VAT number is the company number prefixed with BE: BE0790280576 for Steeldraft, if the company is VAT-registered. Its company number (CBE) is 0790.280.576.
Where is the registered office of Steeldraft?
According to the CBE register, the registered office of Steeldraft is in 9930 Lievegem.
What is the equity of Steeldraft?
At the close of the 2025 financial year, the equity of Steeldraft amounts to 159,962 €, a solvency of 93.0% of total assets.
How many people work at Steeldraft?
0.4 full-time equivalents on average according to the 2025 social balance sheet.
Who manages Steeldraft?
The register lists 1 active mandates at Steeldraft. Names and roles are in the full file, with the deeds published in the Belgian Gazette.
The full file of Steeldraft
Directors and mandates, ownership network, Gazette deeds, ten years of accounts and ratios, Excel export, and Idonis's analysis in one question.
Open the full file →